The Complete Engineering Solution for Process Equipments
  • Equipment Joint efficiency as per Indian boiler regulations-1950.

    Evaluation of Equipment Joint Efficiency as per Regulations 366 (a) for Fusion Welded shell will be as follows.

    Equipment Classification Radiography Joint Efficiency
    Class - I FULL 0.9 (1.0 for Seamless)
    Class - II SPOT 0.50 – If Welded from Both Side
    0.75 – If Welded from One Side only
    (1.0 for Seamless)
    Class - III NIL 0.45 (1.0 for Seamless)
  • Equipment Classification as per Indian boiler regulations-1950.

    Evaluation of Equipment Classification as per Regulations 365 (f) (2) for Fusion Welded shell will be as follows.

    Description Units Limits of application
    Class - III Class - II Class - I
    Working Pressure (Pi) Kg/cm2 (g) 4 ≤ Pi < 7 7 < Pi ≤ 35 35 < Pi
    Design Temperature (Tdi) °C Tdi ≤ 171 171 < Tdi ≤ 343 343 < Tdi
    Product of Working Pressure and Inside Diameter (Pi* Di) Kg/cm Pi * Di ≤ 940 940< Pi * Di ≤3750 3750 < Pi * Di